Electric vehicle manufacturers depend on power electronics that convert energy efficiently and operate reliably across a wide range of electrical conditions. The on-board charger (OBC), AC charging subsystem and related power modules must tolerate variations in the incoming supply while controlling current, protecting internal components and coordinating with the vehicle. Development and production teams need to reproduce these conditions in a controlled environment, especially when testing across regional AC networks or comparing hardware and firmware revisions.
A regenerative AC source and load can provide a programmable AC test interface and absorb power during appropriate tests. Ainuo identifies new-energy vehicle applications for its ANRGL(F) series and describes AC, DC and AC+DC output, four-quadrant operation, programmable disturbances and multiple loading modes. This article focuses on how that equipment can fit into EV component validation, while making clear that vehicle-level and charging-system compliance require additional equipment and procedures.

The OBC is a natural candidate for programmable AC input testing because its input stage is exposed to the supply waveform. Engineers may evaluate startup, inrush, input current, power factor, conversion stability, protection thresholds and recovery after abnormal supply conditions. A controlled AC source can vary voltage, frequency and waveform while the OBC operates at defined output loads. The aim is to discover sensitivity before the component reaches vehicle integration or customer use.
The broader EV powertrain contains DC/DC converters, traction inverters, electric drive systems and battery packs. These may need different source and load equipment, especially on the high-voltage DC side. A regenerative AC source/load should therefore be specified for the AC-facing tests it can actually perform; it does not replace a high-voltage battery simulator, bidirectional DC supply, motor dynamometer or vehicle-level charging test system. Separate test boundaries make the programme safer and the results easier to interpret.
EV charging products are sold into markets with different nominal voltages, frequencies, connection arrangements and installation conditions. A design that behaves correctly at one nominal input may respond differently when voltage is low, frequency changes or the waveform is distorted. A programmable source makes it possible to run a controlled voltage/frequency sweep and determine operating boundaries, derating strategy, trip behaviour and restart sequence. Repeating the same sweep on every engineering sample helps identify design changes that improve robustness.
The ANRGL(F) page describes sequence, pulse and step programming, independently configurable phase conditions, adjustable switch-on and switch-off angles, and waveforms that include sine, square, triangular and clipped sine. Harmonic and interharmonic synthesis are also listed. These functions can support engineering investigation of OBC input behaviour. Configure them to match a written test specification: arbitrary waveform stress is useful for exploratory work, but it is not automatically a prescribed regulatory test.
A short voltage dip, abrupt interruption or rapid voltage recovery can reveal whether an OBC maintains stable control, shuts down predictably or attempts to restart repeatedly. A source that programs voltage transitions and timing allows engineers to control the event rather than wait for disturbances on a laboratory mains feed. Start-angle control can be relevant when investigating inrush or surge response because switching at different points in the AC cycle can change transient current. Capture voltage, current and internal status signals together to reconstruct the response.
The road-vehicle electrical environment has its own requirements. ISO 16750-2:2023 addresses electrical loads for electrical and electronic systems and components in road vehicles, including specified supply-voltage tests and other electrical stresses. It is not a general AC grid simulator specification, and its applicability depends on the component and test interface. Use the relevant automotive standards for each port; do not treat a programmable AC source as a substitute for pulse generators or other specialised equipment where the method requires them.
A power-electronics test should consider the load profile as well as the supply. An OBC or charging module may operate at low, medium and high power, and its control loops can behave differently as load changes. Ainuo lists constant-current, constant-resistance, constant-active-power and constant-apparent-power modes, together with RLC and P/Q functions. Crest-factor and power-factor settings can help reproduce different current shapes and load conditions on compatible test paths. Verify that the chosen mode supports the specific DUT connection and power level.
Online adjustment of load parameters can make it easier to move between operating points within an automated sequence. For example, a test can hold a defined steady-state load, introduce a load step and then return to a lower load while the source changes voltage. This supports repeatable comparisons of response time, overshoot, output regulation and protection state. The purpose is to develop an evidence-based operating envelope rather than simply demonstrate that a component turns on under nominal conditions.
OBC development and production testing can involve long periods at elevated power. A conventional load bank dissipates absorbed electrical power as heat, raising room temperature and potentially requiring dedicated cooling capacity. A regenerative load returns absorbed energy to the facility supply within the equipment’s rated capability and approved installation arrangement. In a busy test laboratory, reduced thermal load can improve operating conditions and make it easier to scale the number of benches without proportionally increasing cooling infrastructure.
Evaluate energy recovery using measured test profiles. Estimate the fraction of time the load absorbs power, average absorbed power, regenerative efficiency and facility electricity cost. Include conversion losses and upstream infrastructure costs. A regenerative source/load is not an energy source for the laboratory; it recovers some power that would otherwise become heat during testing. The business case is strongest when the programme runs high-power tests frequently and when the facility can accept returned energy safely.
A production test bench should define the interfaces between programmable AC source, OBC, DC output load, measurement instruments and supervisory controller. Define safe energisation and de-energisation states, pre-charge behaviour where relevant, grounding, connector interlocks, emergency stop and discharge procedures. The source should not be enabled until the DUT and load are connected in the correct state. Fault handling must return the system to a known safe condition rather than rely on an operator interpreting a display.
Ainuo lists RS485 and Ethernet communication as standard and optional RS232 and GPIB interfaces. PC software is described as supporting parameter setup and import/export of arbitrary waveforms. These capabilities can simplify automated recipes, but integration work remains essential: validate command latency, state feedback, parameter ranges, communication-loss behaviour, software version control and traceable result storage. Each record should include the AC profile, load setting, DUT serial number, firmware, instrument identification and measurement data.
Start with the component interface and ratings. Identify single-phase or three-phase input, nominal and maximum AC voltage, current, frequency, active and apparent power, expected inrush, overload duration and test duty cycle. Specify whether AC+DC output or any DC functionality is required, and whether the same platform will also be used for a separate DUT type. Confirm the maximum regenerative power accepted by the facility and protective-device requirements. A platform that matches the OBC rating at steady state may still be undersized for surge or transient testing.
Ainuo’s ANRGL(F) overview lists 6–36 kW and input of 342–480 V at 47–63 Hz, with output of 0–350 VAC or 0 to ±495 VDC and a stated current range of 35–540 A. Detailed tables list various single-phase and three-phase configurations and other ratings. Confirm the exact selected model’s specifications and suitability with the supplier. Use separate equipment wherever the required voltage, current, isolation or transient capability falls outside the published envelope.
Can this equipment test a complete EV charging station? It may support selected AC electrical tests on compatible components, but a complete charging-station evaluation also involves communication, control-pilot functions, protective earthing, residual-current protection, connectors, thermal behaviour and other system-specific tests. IEC 61851-1 covers general requirements for EV conductive charging equipment, including operating characteristics, connection and electrical safety.
Can it test an OBC at every global mains voltage? Only within the selected model’s voltage, frequency, current and power limits. A multi-market test plan should list each target supply condition and verify that the instrument can generate it with the required phase configuration and accuracy.
Does regenerative loading eliminate the need for a DC load? No. The correct load depends on the OBC output interface and test objective. An AC regenerative load can handle compatible AC-side energy, while a DC output test may require a separate electronic load rated for the OBC’s DC output.
For EV component developers, a regenerative AC source and load can improve OBC and AC-input power-electronics testing by making supply conditions programmable, load profiles repeatable and high-power tests less dependent on dissipative load banks. Its value is highest when the test plan covers normal operating points and deliberately abnormal conditions, with measurements tied to clearly defined acceptance criteria.
Ainuo’s ANRGL(F) provides a candidate platform for selected new-energy vehicle laboratory and production applications. Confirm model-specific electrical limits, required automotive test methods and the full bench architecture before deployment; a flexible AC source/load is one element of a complete EV component validation system.
*Please fill in the required information carefully, and we will contact you within 4-8 hours.
TEL:+86 532 83995188
PHONE:+86 177 5322 5039
E-MAIL:ainuo@ainuo.com
ADDRESS:No. 134 Zhuzhou Rd, Laoshan District, Qingdao, China
Copyright©2025. Aino Instrument Co., Ltd All Rights Reserved.
Powered by:WDL